In the hierarchy of hazard control, PPE comes:
Choices
- AFirst - always start with PPE
- BLast - only after eliminating, substituting, or controlling the hazard at sourceCorrect
- CAs an alternative to risk assessment
- DAbove engineering controls
Answer
Last - only after eliminating, substituting, or controlling the hazard at source
The standard hierarchy is: Eliminate → Substitute → Engineering controls → Administrative controls → PPE. PPE is the last line of defence because it relies on the worker using it correctly.
Practice the full CSCS Health & Safety Test
30 questions in the pool · 25-question timed exam.
More from this topic
- Q13A standard hard hat (safety helmet) on a UK construction site:
- Q14When working at height (above ground or another level), the priority is:
- Q15Before climbing a ladder, you must check:
- Q16Scaffolding must be inspected by a competent person:
- Q17The minimum required edge protection on a working platform above 2 metres includes:
- Q18A "permit to work" is required for: